The team was excited by the prospect of such
a seemingly ‘fun’ project but soon realised that small challenges do not
necessarily mean simple. The ambitious layout designed included landings,
a cargo net level, a climbable peg board wall and ladders – all required to
meet a tight budget and weight limit. The dedicated team completed the
finished product whilst meeting the brief with minimal compromises and was well
received at the show. FMG Engineering together with Madisson Projects
raised a staggering $6,500 at auction which is the best result of all.
John Whitehead
FMG Engineering, Project Engineer – Urban Projects
No comments:
Post a Comment